-
Posts
5,629 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Status Updates posted by Pres
-
Rain once more here, pots are taking a long time to dry, but makes it easier to assemble after throwing lots of pieces.
-
87F. Yesterday.. . . weather is nice, and presently I do not need it! Next week when I get back from GA I have more chalices and patens to do, and some funerary urns to do. Working on cleanup and try working with the white clay.
-
Bisquefired two large pickling crocks last night. Largest was 25#, thicker walls than usual, but wanted it to hold up to abuse, and the rim is a water catch to cut the oxygen contamination to the interior. Glazing later in the week as Med emergency with wife(broken shoulder).
-
Posted answers to Potters Quiz of the week 3, Sorry I was late, but yesterday was tiring with lots of driving and a 3am turn off of the glaze firing. At least it got me out of the house until today-no peeking.
-
New pig tail in, jumper, and holders replaced. Elements were within specs for firing. One set of fuses replaced, and everything put away. Now firing in 99F. heat.
-
Load of Chalice and paten glaze out last night, popping popcorn and mailing out 5. kiln also had 20+ mugs and some medium sized bowls. I am trying the spray on route with the hazelnut, it was not perfect, but much better than most loads with it so far.
-
Getting together Christmas pots for orders and family and friends. Sudden cold makes the shop chilly. Have to wear insulated pants!