Jump to content

glazenerd

Members
  • Posts

    3,267
  • Joined

  • Last visited

Status Replies posted by glazenerd

  1. Started to send out Communion sets this week.

  2. I've been chomping at the bit to get outdoors, clear my creative head...so, after a few delays, my wife was sick (better not go yet) and so on and so forth I finally made it out on the road at 3am Wednesday morning (insert happy face here). The road was empty and conditions were clear, the drive up to lovelock was easy as 6 hour drives go and the gnawing pain on the left side of my lower back was tolerable. I checked into the casino at 9 in the morning and they had a room ready right away...

  3. Just read the most directly applicable journal of clay platelet charges in relation to surface area: filled in the remaining blanks I had. I am a happy man.

  4. was throwing today in my new studio. Yay! Now I am waiting for the electric company to hook up the power. But I will be ready with kiln loads of pots. POR FIN!!!

  5. Back to the drawing board. I fired a kiln to ^6 with a pyro barin my sitter. New sitter, new everything, except infinite switches (no long can get), but it never got there. Brand new elements. It was firing fine till last nite. It's still cooling. Going to fire in my small kiln to finish an order. And work on the big kiln. I will fix it or try basket weaving in my padded room.

  6. Kiln cooling. Happy tomorrow? LOL

  7. Biking around lagoon with dog, koala in middle of road, dog needs restraining, koala latches onto my leg, and sinks teeth into right knee, teeth either sid eof my patella,.... claws deep into my calf muscle, prised the thingie off woith ma pottinig hands...

  8. 70 in mid Febuary. So for the first time in many years during winter- I am going to glaze fire tomorrow.

  9. Warms to low 90s every day in Cambodia-good for drying clay

  10. Made an army of test tiles. Just to dead soliders in the end?

  11. I have a dipping glaze for my classroom, but want to have a small bottle, do the students can brush it on as well. What should I add to the small bottle? Epsom Salts to keep it suspended? Gum solution so it dries slower?

  12. still testing glazes....but making things while I wait for results.

  13. the electrician came today and installed the meter for new service to the kiln shed 200 amp meter. Plus a panel box inside. My big oval will be direct wired to the panel and plugs for the 2 smaller kilns. The energy company is next to approve the wiring, then the electrician comes back for the wiring to the kilns. Signed up for a wood firing at the Red Lodge clay center in April. I can bisque soon.

  14. Visited the Japanese sponsored pottery with climbing kiln today in Cambodia -threw a pot there as well

  15. got the last pegboard up. Mounted my extruder. Dropped off boxes, plastic and metal at recycling. had some water leak into the kiln shed floor. Snow mounds are still melting a lot. I think I will solve that problems as soon as it warms up.

  16. Working on a dog themed show for April at our cooperative gallery. Dogs on my mind!

  17. Glaze firing started yesterday, kiln open on low at 5pm, 8pm closed with no plugs at high, 12am backed to 3/4, checked at 3am,up at 7 to check , ^6 nearly down-turned all to high, 7:20 am ^6 is down, kiln cut back to 30% turn off soon by noon.

  18. Hoping the Kiln God has been good to me. 1 hour to kiln opening!

  19. last kiln till march is cooling down.stocked outlets up.shifting gears for trip now

  20. Posted video of opening up a bowl with the elbow at my blog site, Had said I would post it a year ago, but didn't make it.

  21. Having a great weekend around Yellowstone Park. saw a wolf stalking an elk, Lots of wildlife and gorgeous skies, rock/thermal formations. LOts of snow, wind and sun.

  22. Posted video of opening up a bowl with the elbow at my blog site, Had said I would post it a year ago, but didn't make it.

  23. Shipping about 200 cups to Korea... Who woulda thunk it!?!

  24. I mixed clay today! Picked up dry clays about 11, did errands, and started mixing about 1 pm while the sun was warm . Cold front is coming in tonight. Beat it! So happy. Mixed about 270 pounds wet. That should be a good start. This batch is for making new saggers. I didn't bring many with me. My birthday is Wed. so I can celebrate by doing some throwing. Kilns will be getting wired in Mid- February.

  25. I just started working with a ^5 laguna that I took to ^6. got some translucency. but not overall. Guess I need to go thinner. Help

×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.